Wastewater Collection & Treatment

The Wastewater collection system includes more than 525,000 feet of pipe ranging in size from 6 inch to 36 inch. Treatment is provided at our permitted 4.5 million gallons per day Kings Creek Wastewater Treatment Plant located at 101 Mt. Hebron Road.

The Industrial Pretreatment Office, also at this location, oversees Industrial Permitting and Discharge Requirements into the sewer system. Pretreatment also monitors grease traps throughout the City sewer system.

For more information contact:

  • Wastewater Plant: 972-551-6630
  • FAX 972-551-6645
  • Pretreatment: 972-551-6631

Wastewater Forms and Studies

    Search could not be preformed at this time. Please try again later.